Lawari Tunnel road blocked for vehicular traffic

G. H. Farooqi

CHITRAL: The only land route connecting Chitral District of Khyber – Pakhtunkhawa to other parts of Pakistan has been blocked near Lawari Tunnel, due to heavy snowfall in Dir area.

PIA’s scheduled flights have also not taken place during the last four days, creating severe problems for commuters and transporters.

There are also reports that the main road of Garam Chashma remains blocked for the last two blocked for the past fourteen (14) days, stranding thousands of people on both sides of the valley.

An official of the National Highway Authority (NHA) Dir office told this scribe that snowfall has stopped and bulldozers are being deployed to remove the snow from the road to open Southern side of the Lawari Tunnel for vehicular traffic.

Social and political circle of the area have demanded from high ups of NHA for early opening of Lawari tunnel road for vehicular traffic.


About Pamir Times

Pamir Times is a multi-lingual news portal operational since October 2007.
This entry was posted in Pakistan and tagged , , , , , , , . Bookmark the permalink.

One Response to Lawari Tunnel road blocked for vehicular traffic

  1. Pingback: Lawari Tunnel road blocked for vehicular traffic | Tea Break

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s