Spillway of the dammed Hunza River closed again, 2.6 ft water rise recorded during 4 days

Aerial view of the lake barrier. File photo

PT Report

Shishkat, February 15: The Frontier Works Organization has again closed spillway of the dammed Hunza River to carry out excavation work on the barrier, near Attabad.

According to a local activist the water level has risen by around 2.6 ft during the last four (4) days.

The water level is likely to rise by 12 ft during the next six days, when the spillway will be opened again to drain the stored water.

In the meanwhile, boats are operating in the dammed river, ferrying goods and merchandize to and from Gojal Valley. The boat service comes to a halt occasionally due to strong winds.

The local people have demanded concrete and technically sound action instead of cosmetic ‘look-buys’ tactics, an accusation they level against the responsible organization.


About Pamir Times

Pamir Times is a multi-lingual news portal operational since October 2007.
This entry was posted in Pakistan and tagged , , , , , , , , , , , . Bookmark the permalink.

One Response to Spillway of the dammed Hunza River closed again, 2.6 ft water rise recorded during 4 days

  1. Pingback: Spillway of the dammed Hunza River closed again, 2.6 ft water rise recorded during 4 days | Tea Break

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s